SHEILA 

EGR 486

Work in Progress
 May 15, 1998                   July 3, 1998
 May 22, 1998                   July 10, 1998
 May 29, 1998                   July 17, 1998
 June 5, 1998                     July 24, 1998
 June 12, 1998
 June 19, 1998`
 June 26, 1998

EGR 474 Integrated Manufacturing Controls

HOMEWORK PROBLEMS
NC LAB-MILL
CNC LAB-LATHE
 

PROJECT - ROBOTIC ARM

 

470 Product and Process Design

Assignment #1

 Mechanical pencil
 Drawings

 Assignment #2
 Problem #1
 Problem #2
 Problem #3
 Problem #4
 
Assignment #3
 

 Assignment #4

Assignment #5

Project
Design
Redesign
 

 
 

Engineering Assignments

Engineering "450" Cool Stuff

450 Project Last Revised: July 28th, 1997
EMAIL_ADDRESS