Process Plan
for
EGR 367 Manufacturing Project:
by: Matt Remelts
1. Base
- layout triangle on 3/16" sheet metal
- shear along layout lines
- deburr with disk sander
- layout 1/2" support rod hole
- punch hole with punch press
2. Top Support
- layout triangle on 1/8" sheet metal
- shear along layout lines
- layout neck cradles
- cut with plasma cutter
- deburr with disk sander
3. Cradle Collar
- layout triangle and support rod hole on 3/4" steel block
- drill and countersink 1/2" support rod hole with drill press
- cut triangle with contour saw
- deburr with belt sander
4. Support Rod
- mark 1/2" CRS rod to length
- cut with cut-off saw
- deburr with belt sander
5. Assembly
- tack weld support rod to base from bottom of punched hole
- check for squareness
- finish weld
- slide cradle collar onto support rod
- align and weld from the underside
- locate top support onto support rod
- align and weld
6. Acoustic Cradle
- cut two 1/2" CRS rods to length
- mark where the bends are located
- bend the rod
- check for correct guitar height and find necessary orientation of connecting rod (from the cradle to the cradle collar)
- weld connecting rod to collar
- weld cradle to connecting rod
7. Electric Cradle
- cut 1/2" CRS rod to length
- mark where bends are located
- bend the rod
- check for correct orientation and guitar height
- weld to cradle collar
8. Prime and paint.
9. Use liquid rubber to coat the main and neck cradles.