Sheet1

Part # Parts/Operations 2 Digit Handling Code   Handling Time(sec/part) 2 Digit Insertion Code   Insertion Time (sec/part) Operation Time (sec) Labor Rate ($/sec) Operation Cost ($) Theoretical Parts Needed
Pencil Body 1 0 0 1.10 0 0 1.5 2.60 0.0028 0.0072 1
Lead Holder Subass'y 1 0 0 1.10 0 2 2.5 3.60 0.0028 0.0100 1
Pointed Cap 1 0 1 1.43 3 8 6.0 7.43 0.0028 0.0206 0
Lead 5 0 8 2.45 0 2 2.5 4.95 0.0028 0.0688 5
Metal Clip 1 0 1 1.43 3 1 5.0 6.43 0.0028 0.0179 0
End Cap 1 0 1 1.43 3 0 2.0 3.43 0.0028 0.0095 1
Eraser 1 0 2 1.81 3 0 2.0 3.81 0.0028 0.0106 1
Totals               32.25   0.1446 9
                       
                       
Efficiency 84%                    
                       
Note: Labor Rate is figured to be$10.00/hour.                      
                       
Redesign calculated with having the Pointed Cap and Metal Clip molded                      
  as one piece with the Pencil Body.                    
                       
                       
Part # Parts/Operations 2 Digit Handling Code   Handling Time(sec/part) 2 Digit Insertion Code   Insertion Time (sec/part) Operation Time (sec) Labor Rate ($/sec) Operation Cost ($) Theoretical Parts Needed
Pencil Body 1 0 0 1.10 0 0 1.5 2.60 0.0028 0.0072 1
Lead Holder Subass'y 1 0 0 1.10 0 2 2.5 3.60 0.0028 0.0100 1
Lead 5 0 8 2.45 0 2 2.5 4.95 0.0028 0.0688 5
End Cap 1 0 1 1.43 3 0 2.0 3.43 0.0028 0.0095 1
Eraser 1 0 2 1.81 3 0 2.0 3.81 0.0028 0.0106 1
Totals               18.39   0.1061 9
                       
                       
Efficiency 147%                    

Last Updated on 2/3/98
By EC 616