Major accomplishments since last report:
Built vacuum bar, built "t-bearings" for X-Y-axis movement, mounted
vacuum bar and air cylinders to table.
Ordered more parts for the new stretching device.
Major problems since last report:
Re-designing linkages. Original linkages did not accomplish what
we had hoped so we have gone to a new design. The design is done
and parts are starting to be fabricated to the design requirments.
Communication with the other members of the group is getting more and more
challenging.
Had to spend this past weekend working on the IMT project that slowed
down my time in the shop. I have decided to outsource more work to
ease the load of fabrication.
Objectives for next week:
Continued assembly of the machine as well as documentation.