· After control charts (X and R) have been developed, and the process is in control, the process capability is 6σ
· The capability index can be calculated for a design
· The capacity Ratio can also be calculated
· The Capability Index is another useful measure
· Some general notes about these indices
· If Cp or Cpk are both too large (>>2) the process may be too good, suggesting less expensive, easier processes could be considered.
· A good rule of thumb for using Cp and Cpk is that if new equipment is being purchased, try to get values above 1.5, if the equipment is already available, 1.33 is acceptable.
· Try Probs #6 pg124, #32,33 pg128